FABRICA · Robotics Reliability, Mass Production & Attrition Queues
Dedicated to Tier-2 embodied robotics attrition: factory-to-attrition ratio (FAR), series subsystem failure rates, M/M/c repair bay divergence, field power ceilings, and human-to-robot control latency.
Subdomain target: fabrica.dioptra.risconlabs.com | Scenario: SYN-ROBO-30D | S-EXT: 0 | S-SIGN: null
FABRICA Closed-Form Calculators (CALC-09..16)
| ID | Name | Closed-Form Formula | Default Value (IEEE-754 Hex) | Limit |
|---|---|---|---|---|
| CALC-09 | Factory-to-Attrition Ratio (FAR) | FAR = (P_fac * (1 - delta_sup)) / (N_act * alpha_c) | 0.800000 ratio (0x3fe999999999999a) | Excludes stockpile buffers and theater transit lead time. |
| CALC-10 | Robotic Intrinsic Availability (Ai) | A_i = MTBF / (MTBF + MTTR) | 0.937500 ratio (0x3fee000000000000) | Excludes maintenance queue waiting and spare-part stockouts. |
| CALC-11 | Series Subsystem Failure Rate | lambda_sys = lambda_act + lambda_bat + lambda_sens + lambda_ctrl | 0.00500000 1/hr (0x3f747ae147ae147c) | Series non-redundant architecture; parallel redundancy requires separate model. |
| CALC-12 | Field Energy Bottleneck Fleet Cap | N_energy = (P_gen * H_op * eta_chg) / e_robot | 422.400 units (0x407a666666666666) | Excludes distribution line losses and extreme ambient derating. |
| CALC-13 | Repair Bay Queue Saturation (rho) | rho = lambda_fail / (c_bay * mu_rep) | 0.933333 util (0x3fedddddddddddde) | Steady-state M/M/c utilization; rho >= 1.0 signals unbounded queue growth. |
| CALC-14 | Human-to-Robot Control Latency | T_resp = t_comm + (N_r * lambda_exc * t_handle) / H_op | 6.40000 s (0x401999999999999a) | Linear queueing approximation; excludes nonlinear operator cognitive fatigue. |
| CALC-15 | Lanchester Square-Law Advantage | I_lan = alpha_B * B_0^2 - alpha_R * R_0^2 | 13.5000 index (0x402b000000000000) | Idealized homogeneous attrition equation; not a real battle forecast. |
| CALC-16 | Component Lead-Time Stockout Days | D_out = I_stock / max(1e-9, d_use - s_alt) | 24.0000 days (0x4038000000000000) | Excludes engineering qualification delay for alternate components. |
Corvel Silicon Edge Profile: CRV-EDGE-INT4-UGV (PINNED_STATIC_BENCHMARK)
Ground logistics UGV local perception and actuator monitor | INT4/INT8 · 24 W · 7.8 ms · 85 C
Assigned Contracted AI Roles (R-06..R-08)
| Role ID | Title | Mission | Required Outputs |
|---|---|---|---|
| R-06 (AI) | Robotics Reliability Engineer | Model UGV and embodied actuator, thermal, and battery MTBF series failure rates. | mtbf_availability_ledger, series_failure_bounds, refutation_conditions |
| R-07 (AI) | Mass-Production Throughput Analyst | Measure factory-to-attrition ratio (FAR) collapse days and critical component stockout bounds. | far_collapse_ledger, supply_disruption_sweep, refutation_conditions |
| R-08 (AI) | Field Logistics & Energy Modeler | Compute field charging bottlenecks, M/M/c repair bay saturation, and operator span-of-control decay. | repair_queue_bounds, span_of_control_curve, refutation_conditions |